Modifications/Additions
 
 


We have a fully equipped undercover workshop to perform modifications on any type of container. We can modify a container to any specifications you require. We can perform any additions you require. Contact us for more details.

Modifications Include

Size - cutdown of both refrigerated and general purpose containers from the standard 20 ft (6m) and 40 ft (12m) to any required size.

Examples Of Some Modified Containers

Archive Stores - fully shelved, interior lighting. High security locking mechanism fitted.
Generator Sheds - For noise control
Mobile Workshops - benches, shelves, lighting, high security locking mechanism fitted.
Mobile Offices - windows, air-conditioning, lighting, benches, shelves, high security locking mechanism.
High Humidity Applications - Temp Range from
Wine Cellars - racks fitted.
Portable Bars - Catering for any size function
Offshore Lifting Containers - Both Refrigerated and Dry
Marine Orders 44 Offshore Containers - Refrigerated and Dry
Drum Crusher - and any specialized application.
Explosive Stores - for the storage of explosive substances, fireworks etc.
Chemical & Dangerous Goods Stores - extra ventilation, sectioned off chemical area, wood lining on walls, steel floor.

Preparation Time Required
Depending on the quantity ordered and the type of modification.

Additions Include

Extra Single Door
Fitted to either side of container or replacing the double doors at the rear of the container. Addition for both Refrigerated and General Purpose containers.


Interior Shelving
Addition for both Refrigerated and General Purpose containers.


Windows, Sliding Doors, Cupboards, Extra Ventilation.


Medium and High Security Locking Mechanism’s. Addition for both Refrigerated and General Purpose containers.


Interior and Exterior Lighting

Safety Alarms. Activated from inside the container. Addition for both Refrigerated and General Purpose containers.

Air Curtin - for Refrigerated containers.

Preparation Time Required
Once an order is place we require between 3 to 5 days depending on the quantity and type of addition.